查电话号码 繁體版 English Francais日本語
登录 注册

austin dam造句

"austin dam"是什么意思  
造句与例句手机版
  • The Austin Dam and Suburban also owns 1.266 miles of yard tracks and siding.
  • Over three decades after the original Austin Dam collapsed, Governor Highland Lakes and Colorado River.
  • It houses a museum dedicated to him, the Austin Dam, the flood of 1911, and the overall history of the town.
  • If the weather was particularly bad, the weather watchers were told to telegraph the Austin Dam ( Tom Miller Dam today ).
  • When first erected, the towers were connected to electric generators at the Austin Dam, completed in 1893 on the site of present-day Tom Miller Dam.
  • The old Austin Dam, partially rebuilt under Mayor Wooldridge but never finished due to damage from flooding in 1915, was finally completed in 1940 and renamed Tom Miller Dam.
  • The manufacturers never came, periodic power shortfalls disrupted city services, Lake McDonald silted up, and, on April 7, 1900, the Austin Dam was dealt its final blow after a spring storm.
  • The dam began operating in 1940 and is located at the site of the city's two previous dams, each of which were destroyed during major floods and each of which shared the same name-Austin Dam.
  • In the late 19th century Austin expanded its city limits to more than three times its former area and the Austin Dam was built to power a new street car line and the new municipal water system.
  • Having gotten a taste of city-owned electric power, they refused to go back; they bought out the local private power company, which used steam-driven generators, and today's Austin Energy municipal utility is in a sense a legacy of the old Austin Dam.
  • It's difficult to see austin dam in a sentence. 用austin dam造句挺难的
如何用austin dam造句,用austin dam造句austin dam in a sentence, 用austin dam造句和austin dam的例句由查查汉语词典提供,版权所有违者必究。